Performaces

Performances

Summary on examples of completed projects

  • 2023
    Client / Chemical Plant

    E-208、E-2208 Solvent Column Heavies Cooler Fabrication

    Client / Chemical Plant

    R4401 Impact Copolymer Reactor Tray Procurement

    Client / Chemical Plant

    Huwei Science Park Project Non-Electro-Polishing Equipment 21 sets Procurement

    Client / Chemical Plant

    Pilot Plant Process Equipment Procurement 17 sets

    Client / Chemical Plant

    Membrane Bio-Reactor(MBR)SKID Fabrication 14 sets

    Client / Chemical Plant

    Ozone(O3) Project Equipment and Piping Instalation

    Client / Chemical Plant

    Arizona Project Electro-Polishing(EP) Equipment Procurement 12 sets for Electronic Grade Isopropanol Plant (EIPA)

    Client / Chemical Plant

    Arizona Project Non-Electro-Polishing Equipment 16 sets Procurement

    Client / Chemical Plant

    Arizona Project Electro-Polishing(EP) Piping Material Procurement

    Client / Chemical Plant

    Arizona Project Steam Condensate Tank Procurement

    Client / Chemical Plant

    Arizona Project Pressure Vessel Procurement 7 sets

    Client / Chemical Plant

    Arizona Project FRP Tank Procurement

    Client / Chemical Plant

    T-2501A Blend Tank Replace EPC(Engineering,Procurement,Construction) Project

    Client / Chemical Plant

    Huwei Science Park Project Electro-Polishing(EP) Piping Material Procurement

  • 2022
    Client / Chemical Plant

    Installion and piping project for TREATER collection Bucket

    Client / Chemical Plant

    Crumb slurry vessel manufacturing and heat recovery system Installion, piping project

    Client / Chemical Plant

    The mixer shaft seal removal, installation and alignment of motor shaft center (19 sets in total)

    Client / Chemical Plant

    The powder improvement project for Buffer tank

    Client / Chemical Plant

    The equipment frame manufacturing and installation project for KD-9772E

    Client / Chemical Plant

    The tower internals removal and installation project

    Client / Chemical Plant

    Design, purchasing and construction project for the pilot plant

    Client / Chemical Plant

    The plate and frame filter press installion and piping project

    Client / Chemical Plant

    The crude hydrogen cooler manufacturing Project

    Client / Chemical Plant

    The annual maintenance equipment / installation / disassembly and water jet cleaning project for electronic grade isopropyl alcohol (EIPA) materials plant

    Client / Chemical Plant

    The annual maintenance pipe project for electronic grade isopropyl alcohol (EIPA) materials plant

    Client / Chemical Plant

    The magnetic chiller installion and piping project

  • 2021
    Client / Chemical Plant

    Electrolytic polishing (EP) storage tank manufacturing project for electronic grade isopropanol plant (EIPA)

    Client / Chemical Plant

    Electrolytic polishing (EP) process equipment manufacturing project for electronic grade isopropanol plant (EIPA)

    Client / Chemical Plant

    Pipeline installation and insulation project for electronic grade isopropanol plant (EIPA)

    Client / Chemical Plant

    Heat exchanger manufacturing project for thermoplastic elastomer plant (TPE)

    Client / Chemical Plant

    Reactor manufacturing project for formalin (FM) plant

    Client / Power Plant

    Main structural steel and cladding work project for gas-fired power plant

  • 2020
    Client / Chemical Plant

    General contracting project for pressure vessel replacement for thermoplastic elastomer plant (TPE) 80M3

    Client / Chemical Plant

    Pipeline project for isopropyl ether (IPE) hydrolysis system

    Client / Chemical Plant

    Gas delivery system installation and piping project for thermoplastic elastomer plant (TPE)

    Client / Chemical Plant

    General contracting project for the air stripping equipment replacement for thermoplastic elastomer plant (TPE)

    Client / Chemical Plant

    Piping project for electrolytic copper foil (ED) equipment for copper foil plant

    Client / Chemical Plant

    Central dust collection system project for thermoplastic elastomer plant (TPE)

    Client / Chemical Plant

    General contracting project for process tail gas recovery system for polypropylene plant (PP)

    Client / Chemical Plant

    Demolition project for ethyl acetate (EAC) plant and alcohol plant

    Client / Chemical Plant

    Heat Exchanger Manufacturing Project For E-401A/B/C

    Client / Chemical Plant

    Electrolytic polishing (EP) storage tank and process equipment manufacturing project for electronic grade isopropanol plant (EIPA)

    Client / Chemical Plant

    500 District Stripper Improvement Project

  • 2019
    Client / Chemical Plant

    General contracting project for GROUND FLARE combustion tower installation

    Client / Chemical Plant

    Reactor manufacturing project for isopropanol plant (IPA)

    Client / Chemical Plant

    Heat exchanger manufacturing project for electronic grade isopropanol plant (EIPA)

    Client / Chemical Plant

    400M3 storage tank replacement project for thermoplastic elastomer plant (TPE)

    Client / Machinery Factory

    Turnkey project for 8600 ping steel structure new plant construction

    Client / Chemical Plant

    Dismantling and moving project for methanol hydrogen plant

  • 2018
    Client / Chemical Plan

    Distillation tower equipment pipeline installation project for pentaerythritol (PE)

    Client / Chemical Plant

    Electrolytic polishing (EP) storage tank and process equipment manufacturing project for electronic grade isopropanol plant (EIPA)

    Client / Chemical Plant

    Reactor equipment manufacturing project for methyl isobutyl ketone (MIBK)

    Client / Chemical Plant

    General contracting project for water treatment system for membrane bioreactor (MBR)

    Client / Machinery Plant

    Turnkey project of 4300 ping steel structure new plant building

    Client / Chemical Plant

    Process equipment manufacturing project for electronic grade isopropanol plant (EIPA)

    Client / Japanese company

    High-speed railway station signal equipment frame (AGB) installation project

    Client / Chemical Plant

    Equipment manufacturing project for isopropyl ether (IPE) plant

  • Before 2017