Summary on examples of completed projects
-
2023Client / Chemical Plant
E-208、E-2208 Solvent Column Heavies Cooler Fabrication
Client / Chemical PlantR4401 Impact Copolymer Reactor Tray Procurement
Client / Chemical PlantHuwei Science Park Project Non-Electro-Polishing Equipment 21 sets Procurement
Client / Chemical PlantPilot Plant Process Equipment Procurement 17 sets
Client / Chemical PlantMembrane Bio-Reactor(MBR)SKID Fabrication 14 sets
Client / Chemical PlantOzone(O3) Project Equipment and Piping Instalation
Client / Chemical PlantArizona Project Electro-Polishing(EP) Equipment Procurement 12 sets for Electronic Grade Isopropanol Plant (EIPA)
Client / Chemical PlantArizona Project Non-Electro-Polishing Equipment 16 sets Procurement
Client / Chemical PlantArizona Project Electro-Polishing(EP) Piping Material Procurement
Client / Chemical PlantArizona Project Steam Condensate Tank Procurement
Client / Chemical PlantArizona Project Pressure Vessel Procurement 7 sets
Client / Chemical PlantArizona Project FRP Tank Procurement
Client / Chemical PlantT-2501A Blend Tank Replace EPC(Engineering,Procurement,Construction) Project
Client / Chemical PlantHuwei Science Park Project Electro-Polishing(EP) Piping Material Procurement
-
2022Client / Chemical Plant
Installion and piping project for TREATER collection Bucket
Client / Chemical PlantCrumb slurry vessel manufacturing and heat recovery system Installion, piping project
Client / Chemical PlantThe mixer shaft seal removal, installation and alignment of motor shaft center (19 sets in total)
Client / Chemical PlantThe powder improvement project for Buffer tank
Client / Chemical PlantThe equipment frame manufacturing and installation project for KD-9772E
Client / Chemical PlantThe tower internals removal and installation project
Client / Chemical PlantDesign, purchasing and construction project for the pilot plant
Client / Chemical PlantThe plate and frame filter press installion and piping project
Client / Chemical PlantThe crude hydrogen cooler manufacturing Project
Client / Chemical PlantThe annual maintenance equipment / installation / disassembly and water jet cleaning project for electronic grade isopropyl alcohol (EIPA) materials plant
Client / Chemical PlantThe annual maintenance pipe project for electronic grade isopropyl alcohol (EIPA) materials plant
Client / Chemical PlantThe magnetic chiller installion and piping project
-
2021Client / Chemical Plant
Electrolytic polishing (EP) storage tank manufacturing project for electronic grade isopropanol plant (EIPA)
Client / Chemical PlantElectrolytic polishing (EP) process equipment manufacturing project for electronic grade isopropanol plant (EIPA)
Client / Chemical PlantPipeline installation and insulation project for electronic grade isopropanol plant (EIPA)
Client / Chemical PlantHeat exchanger manufacturing project for thermoplastic elastomer plant (TPE)
Client / Chemical PlantReactor manufacturing project for formalin (FM) plant
Client / Power PlantMain structural steel and cladding work project for gas-fired power plant
-
2020Client / Chemical Plant
General contracting project for pressure vessel replacement for thermoplastic elastomer plant (TPE) 80M3
Client / Chemical PlantPipeline project for isopropyl ether (IPE) hydrolysis system
Client / Chemical PlantGas delivery system installation and piping project for thermoplastic elastomer plant (TPE)
Client / Chemical PlantGeneral contracting project for the air stripping equipment replacement for thermoplastic elastomer plant (TPE)
Client / Chemical PlantPiping project for electrolytic copper foil (ED) equipment for copper foil plant
Client / Chemical PlantCentral dust collection system project for thermoplastic elastomer plant (TPE)
Client / Chemical PlantGeneral contracting project for process tail gas recovery system for polypropylene plant (PP)
Client / Chemical PlantDemolition project for ethyl acetate (EAC) plant and alcohol plant
Client / Chemical PlantHeat Exchanger Manufacturing Project For E-401A/B/C
Client / Chemical PlantElectrolytic polishing (EP) storage tank and process equipment manufacturing project for electronic grade isopropanol plant (EIPA)
Client / Chemical Plant500 District Stripper Improvement Project
-
2019Client / Chemical Plant
General contracting project for GROUND FLARE combustion tower installation
Client / Chemical PlantReactor manufacturing project for isopropanol plant (IPA)
Client / Chemical PlantHeat exchanger manufacturing project for electronic grade isopropanol plant (EIPA)
Client / Chemical Plant400M3 storage tank replacement project for thermoplastic elastomer plant (TPE)
Client / Machinery FactoryTurnkey project for 8600 ping steel structure new plant construction
Client / Chemical PlantDismantling and moving project for methanol hydrogen plant
-
2018Client / Chemical Plan
Distillation tower equipment pipeline installation project for pentaerythritol (PE)
Client / Chemical PlantElectrolytic polishing (EP) storage tank and process equipment manufacturing project for electronic grade isopropanol plant (EIPA)
Client / Chemical PlantReactor equipment manufacturing project for methyl isobutyl ketone (MIBK)
Client / Chemical PlantGeneral contracting project for water treatment system for membrane bioreactor (MBR)
Client / Machinery PlantTurnkey project of 4300 ping steel structure new plant building
Client / Chemical PlantProcess equipment manufacturing project for electronic grade isopropanol plant (EIPA)
Client / Japanese companyHigh-speed railway station signal equipment frame (AGB) installation project
Client / Chemical PlantEquipment manufacturing project for isopropyl ether (IPE) plant
- Before 2017
-
Client / Chemical Plant
reactor manufacturing project for formalin (FM) plant
Client / Chemical PlantProcess exhaust gas (tail gas) heating furnace renovation project
Client / Chemical PlantGeneral contracting project for phenyl acetylene (PA) hydrogenation system
Client / Chemical PlantGeneral contracting project for new waterfree /flammable hazardous chemicals warehouse
Client / Japanese companyPipeline installation project for Condensate Polishing System for power plant
Client / foreign companySafety linked control system project for Kaohsiung Light Rail Transit Plant